About the project

Our most spacious project, which has a separate bedroom, a living room combined with a kitchen and a loft on 25m2. This project can also be made into a studio-type house, where the living room is combined with a bedroom.

HOUSE DIMENSIONS:

Building area: 3.70 x 7.00m
Living area: 20m2 + 10m2

Living room

Kitchen area

Bathroom

HOUSE PRICE:

Factory kit: 18,459 eur (including VAT)
Basic package: 23,750 eur (including VAT)
Standard package: 29,920 euros (including VAT)
Turnkey: 36,815 EUR (including VAT)

Available plans

HOUSE DIMENSIONS:

Building area: 3.70 x 7.00m
Living area: 20m2 + 10m2

Furu 25.jpg

Price calculation

BASIC EQUIPMENT

Finished from the outside

23,750 euros (including VAT)

The package includes:

wooden frame c24

wool insulation 150mm walls,
200mm floor, 250mm ceiling

triple glazed windows and windows, U~ 0.6

profiled metal roof

wooden plank facade (in color of your choice) or metal wall decoration

diffusion, vapor membranes

OSB flooring

House construction time up to 2 months + possible queue. Before ordering a house, we provide a free consultation, inspect the desired location, adjust the layout and type of foundation.

STANDARD

With interior decoration

29,920 euros (including VAT)

The package includes:

wooden frame c24

wool insulation 150mm walls,

200mm floor, 250mm ceiling

 

triple glazed windows and windows, U~ 0.6


profiled metal roof


wooden plank facade (color of your choice)
or metal wall decoration


diffusion, vapor membranes


vinyl laminate flooring


indoor communications (water pipes, sewage, electricity)


recovery


wooden interior decoration in color of your choice


lighting

UNTIL THE KEY

With kitchen, bathroom and heating

36,815 euros (including VAT)

The package includes:

wooden frame c24

wool insulation 150mm walls,
200mm floor, 250mm ceiling

triple glazed windows and windows, U~ 0.6

profiled metal roof

wooden plank facade (in color of your choice) or metal wall decoration

diffusion, vapor membranes

vinyl laminate flooring

indoor communications (water pipes, sewage, electricity)

recovery

wooden interior decoration in color of your choice

lighting

bathroom equipment (built-in toilet, shower, sink, radiator, boiler)

kitchen unit with appliances (electric hob, refrigerator, extractor hood, sink with tap)

air - air heat pump

Additional services

provision of furniture/home appliances

planning changes

foundation construction

air - air heat pump

air - water heat pump with underfloor heating


 

price by agreement

free of charge

1,680 EUR

1,450 EUR

5,980 EUR



 

electric heated floors

delivery and installation

terrace 20m2

canopy

change of materials or thermal insulation

other, individual services

from 850 EUR

from 1,500 EUR

3,000 EUR (150 EUR/m2)

price by agreement

price by agreement

price by agreement

UNO 35 tūre

Procurement, design and construction process

UNO 35 cena

DESIGN PHASE

CONSTRUCTION PHASE

HOME DECORATION
AND NETWORKS


20% payment
Internal communication networks, interior and facade decoration are being built.

HOUSE FRAMEWORK CONSTRUCTION

30% payment for finishing.
A house is being built, waterproofed and insulated

STARTING CONSTRUCTION

40% advance payment before construction begins for the procurement of materials

PROJECT SELECTION

Choosing a building type according to function

CONCLUSION OF THE CONTRACT

We agree on the details of the order, the project is adjusted, and a contract is signed.
Advance payment of 5%

ROW


Sometimes we can start building construction immediately, sometimes we have to wait in line for up to 2 months.

WINDOW DELIVERY


Windows are manufactured and delivered within 4 weeks of placing the order.

SITE SURVEY

The object is surveyed - the approach, the desired location of the house. We agree on the ideal option.

CONSTRUCTION SITE
PREPARATION


The construction and preparation of the foundation and utilities (water, sewage, electricity) is underway. Access has been facilitated.
Engineering communications can be constructed and connected even after the building is delivered.

DELIVERY**


The building is delivered and placed on the foundation.

PROJECT COORDINATION

If necessary, a simplified procedure for project coordination with the municipality is established. Review within 10 days, coordination takes up to 2 months.

Day 1

Day 3 - 5

Day 1 - 3

Day 20 - 40

Day 1 - 3

n days

Day 4 - 45

Day 18 - 28

Day 40 - 45

Day 5 - 10

Day 4 - 18

* Preliminary purchase process and lead time, depending on the type of house, planned location, and occupancy.

** If the house cannot be delivered as a whole, we can build it on site or deliver the house in parts

Similar completed projects

bottom of page